Marina Pumping Plant No. 3 Pump Replacement Project

Photos

FullSizeRender (11)
IMG_8010
IMG_8347
IMG_8227

Project Details

Marina Pumping Plant No. 3 Pump Replacement Project

County Sanitation District No. 3 of Los Angeles upgraded their Marina Pumping Plant. DPSI was hired as the prime contractor to perform the pump replacement work at Pumping Plant No. 3 in Long Beach, California. 

DPSI’s scope of work included:

  • Demolition of two existing dry pit submersible pumps and associated piping
  • Modification of existing piping and valves
  • Construction of concrete pump pedestals
  • Installation of two 85 horsepower dry pit submersible pumps
  • All associated mechanical, structural, and electrical work, and all other appurtenant work