Maricopa Gas Piping PAUT/CWI Inspection and Surveying

Photos

Seneca_Maricopa Gas Piping PAUT 2

Project Details

Maricopa Gas Piping PAUT/CWI Inspection, Surveying and Engineering Support - Maricopa, CA

DPSI assisted Seneca Resources by performing Phased Array Encoded Ultrasonic Testing (PAUT) and AWS CWI visual weld inspections on a 6” gas pipeline construction project in Maricopa, California. DPSI completed PAUT on nearly 100 welds along with visual CWI inspections.

DPSI also provided as-built surveying services which documented the horizontal and vertical location of welds, crossings, and other pertinent information. The surveyed information was included on as-built drawings for client records.

DPSI also prepared the as-built P&IDs for Seneca’s new natural gas fuel pipeline from the Kern River South Midway Meter Station to their Maricopa Section 18/19 facilities. These P&IDs will be used in a HAZOP review and become a template for further updates to their fuel gas system.  DPSI will also be assisting with updates to their facility natural gas PFDs to identify how the gas is distributed once it reaches the facility.

DPSI was honored to attend Seneca’s Ribbon Cutting ceremony at the pipeline site in Maricopa in October 2018.