by ies | Dec 28, 2019
Maricopa Gas Piping PAUT/CWI Inspection and Surveying Project Details Maricopa Gas Piping PAUT/CWI Inspection, Surveying and Engineering Support – Maricopa, CA DPSI assisted Seneca Resources by performing Phased Array Encoded Ultrasonic Testing (PAUT) and AWS...
by ies | Dec 28, 2019
DOT Pipeline Projects Project Details DOT Pipeline Projects | Kern & Los Angeles Counties, CA A local pipeline company transporting over 2.7 million barrels per day of crude oil, refined products, liquefied petroleum gases and natural gas liquids through 8,000...
by ies | Dec 27, 2019
16” Pipeline Relocation, Pier F&G, Port of Long Beach Project Details 16” Pipeline Relocation, Pier F&G | Port of Long Beach, CA The Port of Long Beach is undergoing a major rail expansion project to ease traffic congestion and improve air quality. As a...
by ies | Dec 27, 2019
Subsea Pipeline Replacement Project Details Beta Offshore Production Complex | Long Beach, CA Beta Offshore replaced two subsea intrafield pipelines running between platforms Elly and Eureka. This effort allowed reintroduction of water injection and reduced energy...
by ies | Dec 27, 2019
Platforms A, B, and Hillhouse Pipeline Replacement Project Project Details Dos Cuadras Offshore Production Unit | Carpenteria, CA DCOR, LLC (DCOR) replaced five subsea pipeline segments within the Dos Cuadras Offshore Production Unit, at Platforms A, B, and Hillhouse....